SRBSmart Route BDFare & Routes
  • Metro
  • Launch
  • Blog
Home
Metro
Launch
Blog

Command Palette

Search for a command to run...

  1. Home
  2. Launch
BIWTA Verified

Sadarghat Launch Terminal - Barisal River Port

153.3 km·9 h·৳429 3rd Class Fare·Sadarghat Launch Terminal-Barisal River Port
Route Details(2 Terminals)

Sadarghat Launch Terminal

Dhaka·Dhaka·Major River Port
0 km

Barisal River Port

Barisal·Barisal·Major River Port
153.3 km

+153.3 km

Vessels on this route(30)

MV Adventure 1
MV Adventure 1

Adventure Launch Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVGeneratorLife Jackets
19 knots·2 Engines
MV Adventure 9
MV Adventure 9

Adventure Launch Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACPrayer RoomTVLife JacketsGenerator
19 knots·2 Engines
MV Adventure 11
MV Adventure 11

Adventure Launch Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACPrayer RoomTVLife JacketsGenerator
19 knots·2 Engines
MV Dipraj
MV Dipraj

Dipraj Shipping Lines

3F
From Dhaka

08:30 PM

From Destination

08:30 PM

Dur. to Dest.

6h 30m

Dur. to Dhaka

6h 30m

Amenities

ACTVGeneratorLife Jackets
16 knots·2 Engines
MV Farhan 8
MV Farhan 8

Farhan Navigation

3F
From Dhaka

08:30 PM

From Destination

07:30 PM

Dur. to Dest.

7h

Dur. to Dhaka

7h

Amenities

ACTVGeneratorLife JacketsCCTV
17 knots·2 Engines
MV Green Line 2
MV Green Line 2

Green Line Water Wings

2F
From Dhaka

03:00 PM

From Destination

08:00 AM

Dur. to Dest.

5h

Dur. to Dhaka

5h

Amenities

ACRestaurantTVWiFiCCTV
25 knots·2 Engines
MV Green Line 3
MV Green Line 3

Green Line Water Wings

2F
From Dhaka

03:00 PM

From Destination

08:00 AM

Dur. to Dest.

5h

Dur. to Dhaka

5h

Amenities

ACRestaurantTVWiFiCCTV
25 knots·2 Engines
MV Kalam Khan 7
MV Kalam Khan 7

Mahfuz Khan Ltd

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVVIP SuiteGeneratorPrayer Room
18 knots·2 Engines
MV Kirtankhola 2
MV Kirtankhola 2

Kirtankhola Navigation

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVGenerator
18 knots·2 Engines
MV Kirtankhola 10
MV Kirtankhola 10

Kirtankhola Navigation

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVFire SafetyMedical Kit
19 knots·2 Engines
MV M Khan 7
MV M Khan 7

M Khan Shipping Lines

4F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

6h 30m

Dur. to Dhaka

6h 30m

Amenities

ACTVGeneratorRestaurantCCTV
18 knots·2 Engines
MV Manami
MV Manami

Salam Shipping Lines Limited

4F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVGeneratorRestaurantCCTVPrayer RoomFree WiFi
20 knots·2 Engines
MV Parabat 8
MV Parabat 8

Parabat Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Parabat 9
MV Parabat 9

Parabat Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Parabat 10
MV Parabat 10

Parabat Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Parabat 11
MV Parabat 11

Parabat Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Parabat 12
MV Parabat 12

Parabat Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer RoomRestaurant
19 knots·2 Engines
MV Parabat 18
MV Parabat 18

Parabat Group

4F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVCCTVGeneratorPrayer RoomVIP SuiteRestaurant
19 knots·3 Engines
MV Sundarban 10
MV Sundarban 10

Sundarban Navigation Co.

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantPrayer RoomCCTVVIP SuiteGenerator
18 knots·2 Engines
MV Sundarban 11
MV Sundarban 11

Sundarban Navigation Co.

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Sundarban 15
MV Sundarban 15

Sundarban Navigation Co.

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVGeneratorPrayer Room
18 knots·2 Engines
MV Sundarban 16
MV Sundarban 16

Sundarban Navigation Co.

4F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACRestaurantCCTVGeneratorPrayer RoomVIP Suite
19 knots·3 Engines
MV Suravi 7
MV Suravi 7

Surovi Navigation

4F
From Dhaka

08:30 PM

From Destination

08:30 PM

Dur. to Dest.

6h 30m

Dur. to Dhaka

6h 30m

Amenities

ACTVGeneratorRestaurantLife Jackets
18 knots·2 Engines
MV Suravi 8
MV Suravi 8

Surovi Navigation

4F
From Dhaka

08:00 PM

From Destination

08:30 PM

Dur. to Dest.

6h 30m

Dur. to Dhaka

6h 30m

Amenities

ACTVGeneratorSofa ZoneLife Jackets
17 knots·2 Engines
MV Suravi 9
MV Suravi 9

Surovi Navigation

4F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

6h 30m

Dur. to Dhaka

6h 30m

Amenities

ACTVGeneratorSofa ZoneLife Jackets
18 knots·2 Engines
MV Surovi 7
MV Surovi 7

Surovi Group

4F
From Dhaka

08:00 PM

From Destination

08:30 PM

Dur. to Dest.

8h 30m

Dur. to Dhaka

7h 30m

Amenities

ACTVGenerator
18 knots·2 Engines
MV Surovi 8
MV Surovi 8

Surovi Group

4F
From Dhaka

08:15 PM

From Destination

08:45 PM

Dur. to Dest.

8h 30m

Dur. to Dhaka

7h 30m

Amenities

ACTVGenerator
18 knots·2 Engines
MV Surovi 9
MV Surovi 9

Surovi Group

4F
From Dhaka

08:30 PM

From Destination

08:30 PM

Dur. to Dest.

8h 30m

Dur. to Dhaka

7h 30m

Amenities

ACTVGeneratorLife Jackets
18 knots·2 Engines
MV Surovi 10
MV Surovi 10

Surovi Group

4F
From Dhaka

08:45 PM

From Destination

09:00 PM

Dur. to Dest.

8h 30m

Dur. to Dhaka

7h 30m

Amenities

ACTVGeneratorPrayer Room
19 knots·2 Engines
MV Tipu 7
MV Tipu 7

Tipu Group

3F
From Dhaka

09:00 PM

From Destination

09:00 PM

Dur. to Dest.

5h 30m

Dur. to Dhaka

5h 30m

Amenities

ACTVGeneratorRestaurant
18 knots·2 Engines
Operators(14)

Green Line Water Transport

Private

Sundarban Navigation Co.

Private

Adventure Launch Group

Private

Dipraj Shipping Lines

Private

Farhan Navigation

Private

Green Line Water Wings

Private

Mahfuz Khan Ltd

Private

Kirtankhola Navigation

Private

M Khan Shipping Lines

Private

Salam Shipping Lines Limited

Private

Parabat Group

Private

Surovi Navigation

Private

Surovi Group

Private

Tipu Group

Private

Bus Connections from this Terminal(1)

Sadarghat to EPZ

SadarghatEPZ

Connect to bus services at Sadarghat

BIWTA Fare Table
ClassDescriptionFare (৳)
Deck / 3rd Class
Open deck floor seating — this is the base class the entire fare formula is calculated from৳429
2nd Class — Chair (modern double-deck, non-AC)
General chair seating on modern double-deck launches, per chair৳472
2nd Class — Sunken Deck Upper Class
Upper class on launches with a sunken-deck design৳644
2nd Class — Chair, Non-AC Upper Class
Chair seating in a non-AC room, upper class on single-deck launches / non-deck class on modern double-deck launches৳644
2nd Class — Chair, AC Upper Class
Chair seating in an AC room, upper class on single-deck launches / non-deck class on modern double-deck launches৳858
2nd Class — Sofa, AC Upper Class
Sofa seating in an AC room, upper class on modern double-deck launches, per sofa৳965
1st Class — Non-AC Berth/Cabin
Sleeping berth with modern amenities on modern double-deck launches, non-AC, per berth৳1716
1st Class — AC Berth/Cabin
Sleeping berth with modern amenities on modern double-deck launches, AC, per berth৳1780
Family Cabin — Non-AC
Private room for a family with sleeping and toilet facilities, non-AC, priced per cabin৳4719
Family Cabin — AC
Private room for a family with sleeping and toilet facilities, AC, priced per cabin৳5148
VIP Cabin
Well-appointed room with AC, attached bathroom, balcony and corridor, minimum 2-passenger occupancy, priced per cabin৳6435

Tips for This Route

  • Check the fare table to compare prices across different travel classes before purchasing your ticket.
  • Arrive at the departure terminal at least 30 minutes before the scheduled departure time.
  • During holidays and peak seasons, book your ticket in advance as launches fill up quickly.

Making public transit information accessible and structured for everyone in the Dhaka Metro Area.

Navigate
Resources
  • Data Sources
  • Bus Fare Data — BRTA rate cards & routes
  • Launch Routes — Community BIWTA data
  • BIWTA Gazette — Official launch fares
Legal

Engineered By

Hussain Ahmed

Built for Dhaka

© 2026 Smart Route BD. All rights reserved.

Smart Route BD
Routes
Fare Calculator
Fare Chart
Metro Rail
Blog
About Project
Contact
Privacy Policy
Terms & Conditions
Disclaimer